| Lot No | Date & Time | Product | Photos |
|
1 [1]
|
Start Time:
10/03/10 10:30 AM
End Time :
10/03/10 11:15 AM
|
M.S. SCRAP
Quantity: 280.00 MT; Bid Qty: 1 MT
|
|
|
2 [2]
|
Start Time:
10/03/10 10:30 AM
End Time :
10/03/10 11:00 AM
|
M.S LATHE CUTTINGS
Quantity: 0.80 MT; Bid Qty: 1 MT
|
|
|
3 [3]
|
Start Time:
10/03/10 10:30 AM
End Time :
10/03/10 1:05 PM
|
CAST IRON SCRAP
Quantity: 25.00 MT; Bid Qty: 1 MT
|
|
|
4 [4]
|
Start Time:
10/03/10 10:30 AM
End Time :
10/03/10 11:15 AM
|
CAST STEEL SCRAP
Quantity: 25.00 MT; Bid Qty: 1 MT
|
|
|
5 [5]
|
Start Time:
10/03/10 10:30 AM
End Time :
10/03/10 12:15 PM
|
NI HARD SCRAP
Quantity: 1.50 MT; Bid Qty: 1 MT
|
|
|
6 [6]
|
Start Time:
10/03/10 10:30 AM
End Time :
10/03/10 11:20 AM
|
BEARING METAL SCRAP
Quantity: 0.50 MT; Bid Qty: 1 MT
|
|
|
7 [7]
|
Start Time:
10/03/10 10:30 AM
End Time :
10/03/10 11:50 AM
|
CONVEYOR BELT SCRAP
Quantity: 4.00 MT; Bid Qty: 1 MT
|
|
|
8 [8]
|
Start Time:
10/03/10 10:30 AM
End Time :
10/03/10 11:15 AM
|
SCRAP TYRE
Quantity: 1.00 Lot; Bid Qty: 1 Lot
|
|
|
9 [9]
|
Start Time:
10/03/10 11:00 AM
End Time :
10/03/10 11:45 AM
|
MANGANESE SCRAP
Quantity: 23.00 MT; Bid Qty: 1 MT
|
|
|
10 [10]
|
Start Time:
10/03/10 11:00 AM
End Time :
10/03/10 11:40 AM
|
M.S. SCRAP
Quantity: 34.78 MT; Bid Qty: 1 MT
|
|
|
11 [11]
|
Start Time:
10/03/10 11:00 AM
End Time :
10/03/10 11:50 AM
|
CAST IRON SCRAP
Quantity: 3.94 MT; Bid Qty: 1 MT
|
|
|
12 [12]
|
Start Time:
10/03/10 11:00 AM
End Time :
10/03/10 11:50 AM
|
M.S. SCRAP
Quantity: 12.00 MT; Bid Qty: 1 MT
|
|
|
13 [13]
|
Start Time:
10/03/10 11:00 AM
End Time :
10/03/10 11:30 AM
|
M.S. SCRAP
Quantity: 98.00 MT; Bid Qty: 1 MT
|
|
|
14 [14]
|
Start Time:
10/03/10 11:00 AM
End Time :
10/03/10 12:35 PM
|
CAST IRON SCRAP
Quantity: 2.26 MT; Bid Qty: 1 MT
|
|
|
15 [15]
|
Start Time:
10/03/10 11:00 AM
End Time :
10/03/10 11:35 AM
|
CAST STEEL SCRAP
Quantity: 4.38 MT; Bid Qty: 1 MT
|
|
|
16 [16]
|
Start Time:
10/03/10 11:00 AM
End Time :
10/03/10 11:30 AM
|
G I SCRAP
Quantity: 7.79 MT; Bid Qty: 1 MT
|
|
|
17 [17]
|
Start Time:
10/03/10 11:30 AM
End Time :
10/03/10 12:30 PM
|
ELECTRICAL SCRAP
Quantity: 2.21 MT; Bid Qty: 1 MT
|
|
|
18 [18]
|
Start Time:
10/03/10 11:30 AM
End Time :
10/03/10 12:00 PM
|
Polyurethane & Rubber Screen Mat Scrap
Quantity: 3.56 MT; Bid Qty: 1 MT
|
|
|
19 [19]
|
Start Time:
10/03/10 11:30 AM
End Time :
10/03/10 12:00 PM
|
Astm Logwasher Tube(15000 EACH)
Quantity: 4.00 Nos.; Bid Qty: 1 Nos.
|
|
|
20 [20]
|
Start Time:
10/03/10 11:30 AM
End Time :
10/03/10 12:10 PM
|
MANGANESE SCRAP
Quantity: 2.94 MT; Bid Qty: 1 MT
|
|
|
21 [21]
|
Start Time:
10/03/10 11:30 AM
End Time :
10/03/10 12:20 PM
|
M.S. SCRAP
Quantity: 30.00 MT; Bid Qty: 1 MT
|
|
|
22 [22]
|
Start Time:
10/03/10 11:30 AM
End Time :
10/03/10 12:35 PM
|
CAST IRON SCRAP
Quantity: 1.00 MT; Bid Qty: 1 MT
|
|
|
23 [23]
|
Start Time:
10/03/10 11:30 AM
End Time :
10/03/10 12:00 PM
|
CONVEYOR BELT SCRAP
Quantity: 0.50 MT; Bid Qty: 1 MT
|
|
|
24 [24]
|
Start Time:
10/03/10 11:30 AM
End Time :
10/03/10 12:00 PM
|
Polyurethane & Rubber (Rs.5/kg)
Quantity: 500.00 KG; Bid Qty: 1 KG
|
|
|
25 [25]
|
Start Time:
10/03/10 12:00 PM
End Time :
10/03/10 1:20 PM
|
Astm Logwasher Tube (Rs.15000 Each)
Quantity: 2.00 Nos.; Bid Qty: 1 Nos.
|
|
|
26 [26]
|
Start Time:
10/03/10 12:00 PM
End Time :
10/03/10 12:30 PM
|
M.S. SCRAP
Quantity: 45.00 MT; Bid Qty: 1 MT
|
|
|
27 [27]
|
Start Time:
10/03/10 12:00 PM
End Time :
10/03/10 12:30 PM
|
G I SCRAP
Quantity: 2.00 MT; Bid Qty: 1 MT
|
|
|
28 [28]
|
Start Time:
10/03/10 12:00 PM
End Time :
10/03/10 12:45 PM
|
M.S. heavy
Quantity: 66.00 MT; Bid Qty: 1 MT
|
|
|
29 [29]
|
Start Time:
10/03/10 12:00 PM
End Time :
10/03/10 12:40 PM
|
M.S. light
Quantity: 48.00 MT; Bid Qty: 1 MT
|
|
|
30 [30]
|
Start Time:
10/03/10 12:00 PM
End Time :
10/03/10 12:40 PM
|
Screen cloths
Quantity: 5.23 MT; Bid Qty: 1 MT
|
|
|
31 [31]
|
Start Time:
10/03/10 12:00 PM
End Time :
10/03/10 12:55 PM
|
Aluminum Cable
Quantity: 4.00 MT; Bid Qty: 1 MT
|
|
|
32 [32]
|
Start Time:
10/03/10 12:00 PM
End Time :
10/03/10 12:35 PM
|
Electrical motor assemblies
Quantity: 1.06 MT; Bid Qty: 1 MT
|
|
|
33 [33]
|
Start Time:
10/03/10 12:30 PM
End Time :
10/03/10 1:10 PM
|
Wire Rope
Quantity: 1.08 MT; Bid Qty: 1 MT
|
|
|
34 [34]
|
Start Time:
10/03/10 12:30 PM
End Time :
10/03/10 1:00 PM
|
Casting Scrap
Quantity: 0.66 MT; Bid Qty: 1 MT
|
|
|
35 [35]
|
Start Time:
10/03/10 12:30 PM
End Time :
10/03/10 1:10 PM
|
Tin scrap
Quantity: 7.00 MT; Bid Qty: 1 MT
|
|
|
36 [36]
|
Start Time:
10/03/10 12:30 PM
End Time :
10/03/10 1:00 PM
|
Broken Bricks (Ground clear basis)
Quantity: 500.00 MT; Bid Qty: 1 MT
|
|
|
37 [37]
|
Start Time:
10/03/10 12:30 PM
End Time :
10/03/10 1:00 PM
|
Used Full Bricks (Ground clear basis)
Quantity: 200.00 MT; Bid Qty: 1 MT
|
|
|
38 [38]
|
Start Time:
10/03/10 12:30 PM
End Time :
10/03/10 1:00 PM
|
Refractory Debris (Ground clear basis)
Quantity: 1000.00 MT; Bid Qty: 1 MT
|
|
|
39 [39]
|
Start Time:
10/03/10 12:30 PM
End Time :
10/03/10 1:20 PM
|
Equipment Scrap (Ground clear basis)
Quantity: 18.00 MT; Bid Qty: 1 MT
|
|
|
40 [40]
|
Start Time:
10/03/10 12:30 PM
End Time :
10/03/10 1:00 PM
|
Used Tyres
Quantity: 1.00 Lot; Bid Qty: 1 Lot
|
|
|
41 [41]
|
Start Time:
10/03/10 1:00 PM
End Time :
10/03/10 1:35 PM
|
Un-used Spares - MCD
Quantity: 1.00 Lot; Bid Qty: 1 Lot
|
|
|
42 [42]
|
Start Time:
10/03/10 1:00 PM
End Time :
10/03/10 2:15 PM
|
Motor-160Kw.4pole
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
43 [43]
|
Start Time:
10/03/10 1:00 PM
End Time :
10/03/10 1:30 PM
|
Bench Grinder - 1 No
Quantity: 1.00 Lot; Bid Qty: 1 Lot
|
|
|
44 [44]
|
Start Time:
10/03/10 1:00 PM
End Time :
10/03/10 1:30 PM
|
Avs drive motors
Quantity: 1.00 Lot; Bid Qty: 1 Lot
|
|
|
45 [45]
|
Start Time:
10/03/10 1:00 PM
End Time :
10/03/10 1:30 PM
|
Belt weigher,150Tph
Quantity: 1.00 Lot; Bid Qty: 1 Lot
|
|
|
46 [46]
|
Start Time:
10/03/10 1:00 PM
End Time :
10/03/10 1:30 PM
|
Avs drive motors (Rs.4000 Per Lot)
Quantity: 2.00 LOT; Bid Qty: 1 LOT
|
|
|
47 [47]
|
Start Time:
10/03/10 1:00 PM
End Time :
10/03/10 1:30 PM
|
355 frame slipring motor
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
48 [48]
|
Start Time:
10/03/10 1:00 PM
End Time :
10/03/10 1:30 PM
|
200Kw,10 pole,355 frame slipring motor
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
49 [49]
|
Start Time:
10/03/10 1:30 PM
End Time :
10/03/10 2:00 PM
|
Panel with 3 nos 7.5Kw VFD,
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
50 [50]
|
Start Time:
10/03/10 1:30 PM
End Time :
10/03/10 2:00 PM
|
7.5Kw VFD,Make Sneider
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
51 [51]
|
Start Time:
10/03/10 1:30 PM
End Time :
10/03/10 2:00 PM
|
7.5Kw motor(Rs. 30000 LOT )
Quantity: 3.00 LOT; Bid Qty: 1 LOT
|
|
|
52 [52]
|
Start Time:
10/03/10 1:30 PM
End Time :
10/03/10 2:00 PM
|
100 KVA DG SET
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
53 [53]
|
Start Time:
10/03/10 1:30 PM
End Time :
10/03/10 2:00 PM
|
WATER PUMP WITH 3.5 KVA ENGINE
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
54 [54]
|
Start Time:
10/03/10 1:30 PM
End Time :
10/03/10 2:00 PM
|
6 KVA DG SET
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
55 [55]
|
Start Time:
10/03/10 1:30 PM
End Time :
10/03/10 2:25 PM
|
COMPRESSOR
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
56 [56]
|
Start Time:
10/03/10 1:30 PM
End Time :
10/03/10 2:00 PM
|
WAGON DRILL
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
57 [57]
|
Start Time:
10/03/10 2:00 PM
End Time :
10/03/10 2:30 PM
|
COMPRESSOR 149
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
58 [58]
|
Start Time:
10/03/10 2:00 PM
End Time :
10/03/10 2:30 PM
|
COMPRESSOR 135
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
59 [59]
|
Start Time:
10/03/10 2:00 PM
End Time :
10/03/10 2:30 PM
|
USED TYRES, SIZE 12 X 24 - 200 Nos.(Rs.1000 each)
Quantity: 200.00 Nos.; Bid Qty: 1 Nos.
|
|
|
60 [60]
|
Start Time:
10/03/10 2:00 PM
End Time :
10/03/10 2:30 PM
|
GEAR BOX, MODEL FU 1000
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
61 [61]
|
Start Time:
10/03/10 2:00 PM
End Time :
10/03/10 2:30 PM
|
DRILLING MACHINE,
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
62 [62]
|
Start Time:
10/03/10 2:00 PM
End Time :
10/03/10 2:35 PM
|
M.S. SCRAP
Quantity: 50.00 Ton; Bid Qty: 1 Ton
|
|
|
63 [63]
|
Start Time:
10/03/10 2:30 PM
End Time :
10/03/10 3:00 PM
|
ELECTRONIC METTLER BALANCE
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
64 [64]
|
Start Time:
10/03/10 2:30 PM
End Time :
10/03/10 3:00 PM
|
MUFFLE FURNACE
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
65 [65]
|
Start Time:
10/03/10 2:30 PM
End Time :
10/03/10 3:00 PM
|
Hot Plate, Make Patak Electric Asset
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
66 [66]
|
Start Time:
10/03/10 2:30 PM
End Time :
10/03/10 3:30 PM
|
M S Scrap Heavy
Quantity: 360.00 MT; Bid Qty: 1 MT
|
|
|
67 [67]
|
Start Time:
10/03/10 2:30 PM
End Time :
10/03/10 3:00 PM
|
M S round Bar in assorted length
Quantity: 9.00 MT; Bid Qty: 1 MT
|
|
|
68 [68]
|
Start Time:
10/03/10 2:30 PM
End Time :
10/03/10 3:05 PM
|
Pig Iron Moulds
Quantity: 150.00 MT; Bid Qty: 1 MT
|
|
|
69 [69]
|
Start Time:
10/03/10 2:30 PM
End Time :
10/03/10 3:50 PM
|
Screen cloth Used
Quantity: 6.00 MT; Bid Qty: 1 MT
|
|
|
70 [70]
|
Start Time:
10/03/10 2:30 PM
End Time :
10/03/10 3:35 PM
|
Used Bearings Scrap
Quantity: 1.00 MT; Bid Qty: 1 MT
|
|
|
71 [71]
|
Start Time:
10/03/10 3:00 PM
End Time :
10/03/10 4:30 PM
|
Copper Tuyers & Coolers
Quantity: 2.80 MT; Bid Qty: 1 MT
|
|
|
72 [72]
|
Start Time:
10/03/10 3:00 PM
End Time :
10/03/10 4:30 PM
|
Enameled Wire Copper
Quantity: 0.06 MT; Bid Qty: 1 MT
|
|
|
73 [73]
|
Start Time:
10/03/10 3:00 PM
End Time :
10/03/10 6:10 PM
|
Copper cables
Quantity: 3.00 MT; Bid Qty: 1 MT
|
|
|
74 [74]
|
Start Time:
10/03/10 3:00 PM
End Time :
10/03/10 3:50 PM
|
Alluminium cables
Quantity: 5.50 MT; Bid Qty: 1 MT
|
|
|
75 [75]
|
Start Time:
10/03/10 3:00 PM
End Time :
10/03/10 4:00 PM
|
Brass turning & brass items
Quantity: 0.08 MT; Bid Qty: 1 MT
|
|
|
76 [76]
|
Start Time:
10/03/10 3:00 PM
End Time :
10/03/10 3:40 PM
|
Wire Rope Scrap
Quantity: 1.50 MT; Bid Qty: 1 MT
|
|
|
77 [77]
|
Start Time:
10/03/10 3:00 PM
End Time :
10/03/10 4:00 PM
|
Alluminium scrap
Quantity: 1.00 MT; Bid Qty: 1 MT
|
|
|
78 [78]
|
Start Time:
10/03/10 3:00 PM
End Time :
10/03/10 3:30 PM
|
Used Bricks-Glendon 30% ALUMINA
Quantity: 30.00 MT; Bid Qty: 1 MT
|
|
|
79 [79]
|
Start Time:
10/03/10 3:30 PM
End Time :
10/03/10 4:25 PM
|
Conveyor Belts
Quantity: 0.70 MT; Bid Qty: 1 MT
|
|
|
80 [80]
|
Start Time:
10/03/10 3:30 PM
End Time :
10/03/10 4:00 PM
|
Unused Spares
Quantity: 1.00 Lot; Bid Qty: 1 Lot
|
|
|
81 [81]
|
Start Time:
10/03/10 3:30 PM
End Time :
10/03/10 4:00 PM
|
Used Tyres:Big Tyres
Quantity: 1.00 Lot; Bid Qty: 1 Lot
|
|
|
82 [82]
|
Start Time:
10/03/10 3:30 PM
End Time :
10/03/10 4:00 PM
|
Automatic Fusion Machine Tr 1000m.
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
83 [83]
|
Start Time:
10/03/10 1:30 PM
End Time :
10/03/10 2:00 PM
|
Pan mixer (R.P- 40000 /LOT)
Quantity: 2.00 Nos; Bid Qty: 1 Nos
|
|
|
84 [84]
|
Start Time:
10/03/10 1:30 PM
End Time :
10/03/10 2:00 PM
|
Quenching pumps
Quantity: 2.00 Nos.; Bid Qty: 1 Nos.
|
|
|
85 [85]
|
Start Time:
10/03/10 1:30 PM
End Time :
10/03/10 2:05 PM
|
H3 180 Gear box(R.P- 20000/LOT)
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
86 [86]
|
Start Time:
10/03/10 1:30 PM
End Time :
10/03/10 2:00 PM
|
H3 180 Gear box (R.P - 20000/LOT)
Quantity: 3.00 Nos.; Bid Qty: 1 Nos.
|
|
|
87 [87]
|
Start Time:
10/03/10 1:30 PM
End Time :
10/03/10 2:00 PM
|
H3 180 Gear box (R.P.20000 per lot)
Quantity: 3.00 Nos.; Bid Qty: 1 Nos.
|
|
|
88 [GAPL/1]
|
Start Time:
11/03/10 10:30 AM
End Time :
11/03/10 11:10 AM
|
M.S SCRAP (MIXED)
Quantity: 50.00 MT; Bid Qty: 1 MT
|
|
|
89 [GAPL/2]
|
Start Time:
11/03/10 10:30 AM
End Time :
11/03/10 11:05 AM
|
M.S FEEDER UNIT SCRAP
Quantity: 14.00 MT; Bid Qty: 1 MT
|
|
|
90 [GAPL/3]
|
Start Time:
11/03/10 10:30 AM
End Time :
11/03/10 11:00 AM
|
MN STEEL SCRAP
Quantity: 30.00 MT; Bid Qty: 1 MT
|
|
|
91 [GAPL/4]
|
Start Time:
11/03/10 10:30 AM
End Time :
11/03/10 11:05 AM
|
M.S Vibrating Screen Scrap (Heavy)
Quantity: 10.00 MT; Bid Qty: 1 MT
|
|
|
92 [GAPL/5]
|
Start Time:
11/03/10 10:30 AM
End Time :
11/03/10 11:10 AM
|
CONVEYOR BELTS SCRAP
Quantity: 5.00 MT; Bid Qty: 1 MT
|
|
|
93 [GAPL/6]
|
Start Time:
11/03/10 10:30 AM
End Time :
11/03/10 11:05 AM
|
SLURRY PUMP W/O MOTOR(R.P 3000 each)
Quantity: 2.00 Nos.; Bid Qty: 1 Nos.
|
|
|
94 [GAPL/7]
|
Start Time:
11/03/10 10:30 AM
End Time :
11/03/10 11:25 AM
|
M.S VIBRATING SCREEN SCRAP (HEAVY)
Quantity: 8.00 MT; Bid Qty: 1 MT
|
|
|
95 [GAPL/8]
|
Start Time:
11/03/10 10:30 AM
End Time :
11/03/10 11:05 AM
|
M.S SCRAP (HEAVY)
Quantity: 200.00 MT; Bid Qty: 1 MT
|
|
|
96 [GAPL/9]
|
Start Time:
11/03/10 11:00 AM
End Time :
11/03/10 11:30 AM
|
POLY URETHENE PANELS
Quantity: 8.00 MT; Bid Qty: 1 MT
|
|
|
97 [GAPL/10]
|
Start Time:
11/03/10 11:00 AM
End Time :
11/03/10 11:35 AM
|
M.S SCRAP(Mixed)
Quantity: 15.00 MT; Bid Qty: 1 MT
|
|
|
98 [GAPL/11]
|
Start Time:
11/03/10 11:00 AM
End Time :
11/03/10 11:30 AM
|
TYRE SCRAP
Quantity: 1.00 Lot; Bid Qty: 1 Lot
|
|
|
99 [GAPL/12]
|
Start Time:
11/03/10 11:00 AM
End Time :
11/03/10 11:30 AM
|
LINK ASSY. OF TATA HITACHI
Quantity: 10.00 MT; Bid Qty: 1 MT
|
|
|
100 [GAPL/13]
|
Start Time:
11/03/10 11:00 AM
End Time :
11/03/10 11:40 AM
|
M.S TANK (WATER TANK)
Quantity: 1.50 MT; Bid Qty: 1 MT
|
|
|
101 [GAPL/14]
|
Start Time:
11/03/10 11:00 AM
End Time :
11/03/10 11:50 AM
|
M.S TANKS
Quantity: 10.00 MT; Bid Qty: 1 MT
|
|
|
102 [GAPL/15]
|
Start Time:
11/03/10 11:00 AM
End Time :
11/03/10 11:30 AM
|
RUBBER HOSE ASSY.
Quantity: 1.00 MT; Bid Qty: 1 MT
|
|
|
103 [GAPL/16]
|
Start Time:
11/03/10 11:00 AM
End Time :
11/03/10 11:30 AM
|
MN SCRAP
Quantity: 5.00 MT; Bid Qty: 1 MT
|
|
|
104 [GAPL/17]
|
Start Time:
11/03/10 11:30 AM
End Time :
11/03/10 12:00 PM
|
HEMM COMPONENT SCRAP
Quantity: 5.00 MT; Bid Qty: 1 MT
|
|
|
105 [GAPL/18]
|
Start Time:
11/03/10 11:30 AM
End Time :
11/03/10 12:10 PM
|
BEARING SCRAP
Quantity: 1.00 MT; Bid Qty: 1 MT
|
|
|
106 [GAPL/19]
|
Start Time:
11/03/10 11:30 AM
End Time :
11/03/10 12:35 PM
|
RUBBER SCRAP
Quantity: 1.00 MT; Bid Qty: 1 MT
|
|
|
107 [GAPL/20]
|
Start Time:
11/03/10 11:30 AM
End Time :
11/03/10 12:00 PM
|
TRACK CHAIN OF PC 600 SCRAP
Quantity: 10.00 MT; Bid Qty: 1 MT
|
|
|
108 [GAPL/21]
|
Start Time:
11/03/10 11:30 AM
End Time :
11/03/10 12:30 PM
|
ELECTRICAL SCRAP
Quantity: 0.20 MT; Bid Qty: 1 MT
|
|
|
109 [GAPL/22]
|
Start Time:
11/03/10 11:30 AM
End Time :
11/03/10 12:25 PM
|
M.S VIBRATING SCREEN SCRAP (HEAVY)
Quantity: 12.00 MT; Bid Qty: 1 MT
|
|
|
110 [GAPL/23]
|
Start Time:
11/03/10 11:30 AM
End Time :
11/03/10 1:45 PM
|
Machine Scrap - Dewatering Pump - 3 Nos
Quantity: 1.00 Lot; Bid Qty: 1 Lot
|
|
|
111 [GAPL/24]
|
Start Time:
11/03/10 11:30 AM
End Time :
11/03/10 12:00 PM
|
M.N. SCRAP
Quantity: 15.00 MT; Bid Qty: 1 MT
|
|
|
112 [GAPL/25]
|
Start Time:
11/03/10 12:00 PM
End Time :
11/03/10 12:55 PM
|
HEAVY RAIL SCRAP
Quantity: 12.00 MT; Bid Qty: 1 MT
|
|
|
113 [GAPL/26]
|
Start Time:
11/03/10 12:00 PM
End Time :
11/03/10 1:00 PM
|
PLANT M.S. SCRAP
Quantity: 25.00 MT; Bid Qty: 1 MT
|
|
|
114 [GAPL/27]
|
Start Time:
11/03/10 12:00 PM
End Time :
11/03/10 12:35 PM
|
BOLT NUT & MISC
Quantity: 5.00 MT; Bid Qty: 1 MT
|
|
|
115 [GAPL/28]
|
Start Time:
11/03/10 12:00 PM
End Time :
11/03/10 12:35 PM
|
SCREEN MATS & GRATINGS
Quantity: 8.00 MT; Bid Qty: 1 MT
|
|
|
116 [GAPL/29]
|
Start Time:
11/03/10 12:00 PM
End Time :
11/03/10 1:00 PM
|
MS SCRAP
Quantity: 10.00 MT; Bid Qty: 1 MT
|
|
|
117 [GAPL/30]
|
Start Time:
11/03/10 12:00 PM
End Time :
11/03/10 12:30 PM
|
RUBBER SCRAP
Quantity: 12.00 MT; Bid Qty: 1 MT
|
|
|
118 [GAPL/31]
|
Start Time:
11/03/10 12:00 PM
End Time :
11/03/10 1:45 PM
|
ELECTRICAL SCRAP
Quantity: 3.00 MT; Bid Qty: 1 MT
|
|
|
119 [GAPL/32]
|
Start Time:
11/03/10 12:00 PM
End Time :
11/03/10 12:30 PM
|
BEARINGS SCRAP
Quantity: 0.60 MT; Bid Qty: 1 MT
|
|
|
120 [GAPL/33]
|
Start Time:
11/03/10 12:30 PM
End Time :
11/03/10 1:00 PM
|
MACHINARY SCRAP
Quantity: 12.00 MT; Bid Qty: 1 MT
|
|
|
121 [GAPL/34]
|
Start Time:
11/03/10 12:30 PM
End Time :
11/03/10 1:40 PM
|
BELT SCRAP(CONVEYAR BELT)
Quantity: 15.00 MT; Bid Qty: 1 MT
|
|
|
122 [GAPL/35]
|
Start Time:
11/03/10 12:30 PM
End Time :
11/03/10 1:40 PM
|
HDPE PIPE SCRAP
Quantity: 4.00 MT; Bid Qty: 1 MT
|
|
|
123 [GAPL/36]
|
Start Time:
11/03/10 12:30 PM
End Time :
11/03/10 1:10 PM
|
MS SCRAP
Quantity: 5.00 MT; Bid Qty: 1 MT
|
|
|
124 [GAPL/37]
|
Start Time:
11/03/10 12:30 PM
End Time :
11/03/10 1:10 PM
|
MS HEAVY SCRAP
Quantity: 25.00 MT; Bid Qty: 1 MT
|
|
|
125 [GAPL/38]
|
Start Time:
11/03/10 12:30 PM
End Time :
11/03/10 1:20 PM
|
VALVE SCRAP
Quantity: 6.00 MT; Bid Qty: 1 MT
|
|
|
126 [GAPL/39]
|
Start Time:
11/03/10 12:30 PM
End Time :
11/03/10 1:00 PM
|
ROD SCRAP
Quantity: 1.50 MT; Bid Qty: 1 MT
|
|
|
127 [GAPL/40]
|
Start Time:
11/03/10 12:30 PM
End Time :
11/03/10 1:00 PM
|
MISC.FILTERS SCRAP
Quantity: 0.20 MT; Bid Qty: 1 MT
|
|
|
128 [GAPL/41]
|
Start Time:
11/03/10 1:00 PM
End Time :
11/03/10 3:05 PM
|
M.S. SCRAP
Quantity: 60.00 MT; Bid Qty: 1 MT
|
|
|
129 [GAPL/42]
|
Start Time:
11/03/10 1:30 PM
End Time :
11/03/10 2:00 PM
|
M.N. STEEL SCRAP
Quantity: 4.00 MT; Bid Qty: 1 MT
|
|
|
130 [GAPL/43]
|
Start Time:
11/03/10 1:30 PM
End Time :
11/03/10 2:05 PM
|
M.S. SCRAP
Quantity: 4.00 MT; Bid Qty: 1 MT
|
|
|
131 [GAPL/44]
|
Start Time:
11/03/10 1:30 PM
End Time :
11/03/10 2:05 PM
|
M.S. SCRAP
Quantity: 1.00 MT; Bid Qty: 1 MT
|
|
|
132 [GAPL/45]
|
Start Time:
11/03/10 1:30 PM
End Time :
11/03/10 2:00 PM
|
MACHINERY SCRAPÂ
Quantity: 5.00 MT; Bid Qty: 1 MT
|
|
|
133 [GAPL/46]
|
Start Time:
11/03/10 1:30 PM
End Time :
11/03/10 2:00 PM
|
SCRAP TYRES
Quantity: 1.00 Lot; Bid Qty: 1 Lot
|
|
|
134 [GAPL/47]
|
Start Time:
11/03/10 1:30 PM
End Time :
11/03/10 2:05 PM
|
SCRAP TYRE TUBES
Quantity: 0.50 MT; Bid Qty: 1 MT
|
|
|
135 [GAPL/48]
|
Start Time:
11/03/10 1:30 PM
End Time :
11/03/10 2:00 PM
|
SCRAP CABINS OF CAT WHEEL LOADERS
Quantity: 0.50 MT; Bid Qty: 1 MT
|
|
|
136 [GAPL/49]
|
Start Time:
11/03/10 2:00 PM
End Time :
11/03/10 2:30 PM
|
LINK ASSY OF EXCAVATOR - 6 NOS
Quantity: 18.00 MT; Bid Qty: 1 MT
|
|
|
137 [GAPL/50]
|
Start Time:
11/03/10 2:00 PM
End Time :
11/03/10 2:30 PM
|
LINK ASSY W/GROUSER SHOES - 4 NOS
Quantity: 20.00 MT; Bid Qty: 1 MT
|
|
|
138 [GAPL/51]
|
Start Time:
11/03/10 2:00 PM
End Time :
11/03/10 2:30 PM
|
GROUSER SHOES - 25 NOS
Quantity: 0.60 MT; Bid Qty: 1 MT
|
|
|
139 [GAPL/52]
|
Start Time:
11/03/10 2:00 PM
End Time :
11/03/10 2:35 PM
|
STEEL RAIL PIECES
Quantity: 2.00 MT; Bid Qty: 1 MT
|
|
|
140 [GAPL/53]
|
Start Time:
11/03/10 2:00 PM
End Time :
11/03/10 2:55 PM
|
M.S. SCRAP
Quantity: 2.00 MT; Bid Qty: 1 MT
|
|
|
141 [GAPL/54]
|
Start Time:
11/03/10 2:00 PM
End Time :
11/03/10 3:15 PM
|
SCRAP CONV. BELT
Quantity: 2.00 MT; Bid Qty: 1 MT
|
|
|
142 [GAPL/55]
|
Start Time:
11/03/10 2:00 PM
End Time :
11/03/10 3:10 PM
|
M.S. SCRAP
Quantity: 10.00 MT; Bid Qty: 1 MT
|
|
|
143 [GAPL/56]
|
Start Time:
11/03/10 2:00 PM
End Time :
11/03/10 2:30 PM
|
MACHINERY SCRAP(PLANT)
Quantity: 2.00 MT; Bid Qty: 1 MT
|
|
|
144 [GAPL/57]
|
Start Time:
11/03/10 2:30 PM
End Time :
11/03/10 3:00 PM
|
M.S. SCRAP
Quantity: 60.00 MT; Bid Qty: 1 MT
|
|
|
145 [GAPL/58]
|
Start Time:
11/03/10 2:30 PM
End Time :
11/03/10 3:25 PM
|
SCRAP CONV. BELT
Quantity: 2.00 MT; Bid Qty: 1 MT
|
|
|
146 [GAPL/59]
|
Start Time:
11/03/10 2:30 PM
End Time :
11/03/10 3:00 PM
|
SCRAP WEAR SHOES
Quantity: 2.00 MT; Bid Qty: 1 MT
|
|
|
147 [GAPL/60]
|
Start Time:
11/03/10 2:30 PM
End Time :
11/03/10 3:25 PM
|
M.S. SCRAP
Quantity: 6.00 MT; Bid Qty: 1 MT
|
|
|
148 [GAPL/61]
|
Start Time:
11/03/10 2:30 PM
End Time :
11/03/10 3:10 PM
|
M.S. SCRAP
Quantity: 1.00 MT; Bid Qty: 1 MT
|
|
|
149 [GAPL/62]
|
Start Time:
11/03/10 3:00 PM
End Time :
11/03/10 4:00 PM
|
Hoist
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
150 [GAPL/63]
|
Start Time:
11/03/10 3:00 PM
End Time :
11/03/10 3:50 PM
|
Electrical panels complete
Quantity: 0.70 MT; Bid Qty: 1 MT
|
|
|
151 [GAPL/64]
|
Start Time:
11/03/10 3:00 PM
End Time :
11/03/10 3:30 PM
|
TIG welding machine
Quantity: 1.00 Nos.; Bid Qty: 1 Nos.
|
|
|
152 [GAPL/65]
|
Start Time:
11/03/10 3:00 PM
End Time :
11/03/10 3:30 PM
|
Plate pieces of 50mm thick
Quantity: 7.00 MT; Bid Qty: 1 MT
|
|
|
153 [GAPL/66]
|
Start Time:
11/03/10 3:00 PM
End Time :
11/03/10 3:30 PM
|
Paper scrap including box file
Quantity: 2.00 MT; Bid Qty: 1 MT
|
|
|
154 [GAPL/67]
|
Start Time:
11/03/10 3:00 PM
End Time :
11/03/10 3:55 PM
|
Machinery Scrap
Quantity: 8.00 MT; Bid Qty: 1 MT
|
|
|
155 [GAPL/68]
|
Start Time:
11/03/10 3:00 PM
End Time :
11/03/10 3:35 PM
|
Aluminium scrap including piston
Quantity: 0.50 MT; Bid Qty: 1 MT
|
|
|
156 [GAPL/69]
|
Start Time:
11/03/10 3:30 PM
End Time :
11/03/10 4:05 PM
|
MS Scrap generated from new plates
Quantity: 25.00 MT; Bid Qty: 1 MT
|
|
|
157 [GAPL/70]
|
Start Time:
11/03/10 3:30 PM
End Time :
11/03/10 4:05 PM
|
Flywheels
Quantity: 1.00 MT; Bid Qty: 1 MT
|
|
|
158 [GAPL/71]
|
Start Time:
11/03/10 3:30 PM
End Time :
11/03/10 4:00 PM
|
High tensile steel scrap
Quantity: 1.00 MT; Bid Qty: 1 MT
|
|
|
159 [GAPL/72]
|
Start Time:
11/03/10 3:30 PM
End Time :
11/03/10 4:05 PM
|
MS Scrap from Plates removed from Barge
Quantity: 125.00 MT; Bid Qty: 1 MT
|
|
|
160 [GAPL/73]
|
Start Time:
11/03/10 3:30 PM
End Time :
11/03/10 4:05 PM
|
Wire rope scrap
Quantity: 5.00 MT; Bid Qty: 1 MT
|
|
|
161 [GAPL/74]
|
Start Time:
11/03/10 3:30 PM
End Time :
11/03/10 4:10 PM
|
Pipe Scrap
Quantity: 5.00 MT; Bid Qty: 1 MT
|
|
|
162 [GAPL/75]
|
Start Time:
11/03/10 3:30 PM
End Time :
11/03/10 4:50 PM
|
Polypropylene rope scrap
Quantity: 10.00 MT; Bid Qty: 1 MT
|
|
|
163 [GAPL/76]
|
Start Time:
11/03/10 3:30 PM
End Time :
11/03/10 4:00 PM
|
Scrap tyres removed from barge
Quantity: 5.00 MT; Bid Qty: 1 MT
|
|